TGS CEDAR PORT DC 14
BUILDING FEATURES
| DELIVERING Q2 2027 |
|---|
| 4400 Cedar Port Parkway, Baytown, TX 77523 |
| ±446,126 SF ON ±23.60 ACRES |
| RAIL-SERVED OR CROSS DOCK CONFIGURATION |
| DUAL RAIL SERVICE AVAILABLE (UP & BNSF) |
| TILTWALL CONSTRUCTION |
| BUILDING DEPTH 400′ |
| CLEAR HEIGHT 40′ |
| BUILD-TO-SUIT OFFICE |
| ESFR SPRINKLER SYSTEM |
| 8″ SLAB AND TRUCK COURTS |
|---|
| POWER: 277/480 VOLT, 3-PHASE, 6,000 AMPS |
| CLERESTORY WINDOWS FOR NATURAL LIGHTING |
| 56’ X 56′ COLUMN SPACING WITH 60’ SPEED BAYS |
| 114 (9’ X 10’) DOCK HIGH DOORS |
| 4 (20’ X 20’) DRIVE-IN DOORS, RAMPED |
| 185’ FULL CONCRETE TRUCK COURT |
| 162 TRAILER PARKS |
| 161 CAR PARKS |
| POTENTIAL TAX INCENTIVES AVAILABLE |


TGS CEDAR PORT DC 14
LOCATION


