Electric

A Premier Planned Business and Industrial Park

  • CenterPoint Energy provides electrical transportation services to the park via three area service stations; Jordan, Mont Belvieu, and Trinity. Mont Belvieu is located NE of the park and has 12 kV distribution. Jordan is located 10 miles NW of the park, is the newest substation in the area and would handle expansions within the park along with Trinity substation. Jordan provides 138 kV and 345 kV transmission lines with 12 kV and 35 kV distribution lines while the Trinity substation located within the industrial park provides 12 kV and 35 kV distribution lines.
  • Discussions underway with CenterPoint Energy to add approximately 25,000 LF of 138kV or 345 kV transmission inside Cedar Port to create a power loop that would serve the site directly
  • Approximately 5 miles of 138kV and 345 kV transmission is currently located inside Cedar Port
  • Trinity substation is located inside Cedar Port Industrial Park